To determine the earliest time all 120 parts can be finished, we must analyze the production rates, setup times, and the constraint that partial parts do not count (integer completions). ### 1. Define Parameters **Machine A:** * Rate ($R_A$): 8 parts/hour * Setup Time ($S_A$): 30 minutes = $0.5$ hours * Production Start Time: $0.5$ hours **Machine B:** * Rate ($R_B$): 5 parts/hour * Setup Time ($S_B$): 12 minutes = $12/60$ hours = $0.2$ hours * Production Start Time: $0.2$ hours **Total Parts Required:** 120 ### 2. Analyze Production Logic Since both machines run simultaneously, we need to find the time $T$ (in hours) when the cumulative integer number of parts produced by Machine A ($N_A$) and Machine B ($N_B$) sum to at least 120. The number of parts produced by a machine is determined by the time available for production ($T - S$) multiplied by the rate, floored to the nearest integer (since partial parts don't count). $$ N_A(T) = \lfloor 8 \times (T - 0.5) \rfloor \quad \text{for } T \ge 0.5 $$ $$ N_B(T) = \lfloor 5 \times (T - 0.2) \rfloor \quad \text{for } T \ge 0.2 $$ We need to find the smallest $T$ such that: $$ N_A(T) + N_B(T) \ge 120 $$ ### 3. Step-by-Step Calculation Let's estimate the time required. If we ignore setup times and integer constraints, the combined rate is $8 + 5 = 13$ parts/hour. $120 / 13 \approx 9.23$ hours. Adding the maximum setup time ($0.5$ hours), the answer should be around $9.73$ hours. Let's test integer hours or half-hours near this estimate. **Test $T = 9.5$ hours:** * **Machine A:** * Production time: $9.5 - 0.5 = 9.0$ hours * Parts: $\lfloor 8 \times 9.0 \rfloor = 72$ parts * **Machine B:** * Production time: $9.5 - 0.2 = 9.3$ hours * Parts: $\lfloor 5 \times 9.3 \rfloor = \lfloor 46.5 \rfloor = 46$ parts * **Total:** $72 + 46 = 118$ parts. * **Result:** Not enough (Need 120). **Test $T = 9.6$ hours:** * **Machine A:** * Production time: $9.6 - 0.5 = 9.1$ hours * Parts: $\lfloor 8 \times 9.1 \rfloor = \lfloor 72.8 \rfloor = 72$ parts * **Machine B:** * Production time: $9.6 - 0.2 = 9.4$ hours * Parts: $\lfloor 5 \times 9.4 \rfloor = \lfloor 47.0 \rfloor = 47$ parts * **Total:** $72 + 47 = 119$ parts. * **Result:** Not enough (Need 120). **Test $T = 9.7$ hours:** * **Machine A:** * Production time: $9.7 - 0.5 = 9.2$ hours * Parts: $\lfloor 8 \times 9.2 \rfloor = \lfloor 73.6 \rfloor = 73$ parts * **Machine B:** * Production time: $9.7 - 0.2 = 9.5$ hours * Parts: $\lfloor 5 \times 9.5 \rfloor = \lfloor 47.5 \rfloor = 47$ parts * **Total:** $73 + 47 = 120$ parts. * **Result:** **Success.** ### 4. Verification of "Immediately Preceding Completion Time" The problem asks to check the immediately preceding completion time. This implies checking if the count reached 120 earlier or if there is a gap between integer completions. Let's look closely at the transition between $T=9.6$ and $T=9.7$. At **$T = 9.6$ hours**: * $N_A = 72$ * $N_B = 47$ * Total = 119 At **$T = 9.7$ hours**: * $N_A$ jumps from 72 to 73. * Machine A produces parts every $1/8$ hour ($7.5$ minutes). * Previous completion for A was at $T$ where $8(T-0.5) = 72 \Rightarrow T-0.5=9 \Rightarrow T=9.5$. * Next completion for A is at $T$ where $8(T-0.5) = 73 \Rightarrow T-0.5=9.125 \Rightarrow T=9.625$. * So, Machine A produces its 73rd part at **$T = 9.625$ hours**. * $N_B$ stays at 47. * Machine B produces parts every $1/5$ hour ($12$ minutes). * Previous completion for B was at $T$ where $5(T-0.2) = 47 \Rightarrow T-0.2=9.4 \Rightarrow T=9.6$. * Next completion for B is at $T$ where $5(T-0.2) = 48 \Rightarrow T-0.2=9.6 \Rightarrow T=9.8$. * So, Machine B produces its 48th part at **$T = 9.8$ hours**. Let's check the total count at the specific completion events: 1. **At $T = 9.6$ hours:** * Machine B just finished its 47th part (since $5 \times 9.4 = 47$). * Machine A has finished 72 parts (since $8 \times 9.1 = 72.8$, floor is 72). * Total = $72 + 47 = 119$. 2. **At $T = 9.625$ hours ($9$ hours $37.5$ minutes):** * Machine A finishes its 73rd part ($8 \times 9.125 = 73$). * Machine B still has 47 parts (next one is at 9.8). * Total = $73 + 47 = 120$. Therefore, the 120th part is completed exactly when Machine A finishes its 73rd part. ### 5. Final Conclusion The earliest time all 120 parts can be finished is **9.625 hours**. **Arithmetic Summary:** * **Machine A:** * Setup: 0.5 h * Time to produce 73 parts: $73 / 8 = 9.125$ h * Total time for A to have 73 parts: $0.5 + 9.125 = 9.625$ h * **Machine B:** * Setup: 0.2 h * Time to produce 47 parts: $47 / 5 = 9.4$ h * Total time for B to have 47 parts: $0.2 + 9.4 = 9.6$ h * Time to produce 48 parts: $48 / 5 = 9.6$ h * Total time for B to have 48 parts: $0.2 + 9.6 = 9.8$ h At $T = 9.625$ h: * Machine A has produced $\lfloor 8(9.625 - 0.5) \rfloor = \lfloor 8(9.125) \rfloor = 73$ parts. * Machine B has produced $\lfloor 5(9.625 - 0.2) \rfloor = \lfloor 5(9.425) \rfloor = \lfloor 47.125 \rfloor = 47$ parts. * Total = $73 + 47 = 120$ parts. At the immediately preceding completion time ($T = 9.6$ h): * Machine A has produced $\lfloor 8(9.6 - 0.5) \rfloor = \lfloor 8(9.1) \rfloor = 72$ parts. * Machine B has produced $\lfloor 5(9.6 - 0.2) \rfloor = \lfloor 5(9.4) \rfloor = 47$ parts. * Total = $72 + 47 = 119$ parts. **Answer:** The earliest time all 120 parts can be finished is **9.625 hours** (or 9 hours and 37.5 minutes).